Projects

Mondium boasts a broad range of expertise in engineering, procurement and construction (EPC) across mineral resources, future energy and industrial processing sectors. Discover the diverse projects we have successfully delivered for our valued clients here. 

Western Turner Syncline Phase 2

Client: Rio Tinto
Location: Pilbara - WA
Sector: Minerals and Resources

Mondium’s scope of work included engineering and design, procurement and site construction work associated with the process plant, overland conveyor and non-process infrastructure with the facility achieving first ore in 2021.
picture of Western Turner Syncline Phase 2

South Flank Inflow

Client: BHP
Location: Pilbara - WA
Sector: Minerals and Resources

Structural, mechanical, piping, electrical and instrumentation (SMPE&I) works associated with the South Flank Inflow infrastructure.
picture of South Flank Inflow

South Flank Outflow

Client: BHP
Location: Pilbara - WA
Sector: Minerals and Resources

Structural, mechanical, piping, electrical and instrumentation (SMPE&I) works associated with the South Flank Outflow infrastructure.
picture of South Flank Outflow

South Flank Thyssenkrupp Stockyard Machines

Client: Thyssenkrupp Industrial Solutions AG
Location: Pilbara - WA
Sector: Minerals and Resources

Structural, mechanical, piping, electrical and instrumentation (SMPE&I) works associated with the assembly of a reclaimer and two stackers at BHP’s South Flank Project in the Pilbara region of Western Australia. The machines have a capacity of 20,000 tonnes per hour, making them the world’s largest rail-mounted stackers and reclaimers.
picture of South Flank Thyssenkrupp Stockyard Machines

West Angelas Deposits C and D

Client: Rio Tinto
Location: Pilbara - WA
Sector: Minerals and Resources

Structural, mechanical, piping, electrical and instrumentation (SMPE&I) works associated with the construction of new iron ore facilities for the West Angelas Deposits C and D, as well as modifications to existing plant.
picture of West Angelas Deposits C and D

Marandoo

Client: Rio Tinto
Location: Pilbara - WA
Sector: Minerals and Resources

Following the successful completion of the Marandoo Mine Phase 2 Project Definitive Engineering Study (DES), Lycopodium was awarded the EPCM contract for the development of the Marandoo Mine Phase 2 for Rio Tinto Iron Ore through the Implementation Phase.
picture of Marandoo

Hope Downs – Infrastructure Services

Client: Rio Tinto and Hancock Prospecting Ltd
Location: Pilbara - WA
Sector: Minerals and Resources

Between January 2008 and May 2009, Lycopodium provided process engineering services to KBR during the Preliminary Engineering Study (PES) and Definitive Engineering Study (DES) for the $400M+ project. Lycopodium key rail personnel were also involved in the design of the rail line from feasibility, scoping and definition design to a level of detail sufficient to provide a +/- 15% cost estimate for the project.
picture of Hope Downs – Infrastructure Services

Nammuldi Below Water Table Project

Client: Rio Tinto
Location: Pilbara - WA
Sector: Minerals and Resources

Lycopodium has been working on this project since 2007 when a number of scoping reports and reviews were undertaken. In late 2009 Lycopodium commenced work on the Preliminary Engineering Study, followed by the Definitive Engineering Study which was completed in December 2011. In January 2012 Lycopodium, in joint venture with URS Australia, was awarded the EPCM contract for infrastructure on the project.
picture of Nammuldi Below Water Table Project